What is a “whole house gut rehabilitation project” for RRP purposes? What RRP requirements, if any, apply during a whole house gut-rehabilitation project? If target housing has, at some point after 1978, been gut-rehabbed, would the RRP Rule apply to subsequent renovations on the property?
The phrase “gut rehabilitation” may have different meanings across the construction industry. EPA, however, used the phrase “whole house gut rehabilitation” in a very limited sense to describe only those activities that demolish and rebuild a structure to a point where it is effectively new construction. At a minimum, these activities include the removal and replacement of all interior and exterior painted surfaces, including windows. The term should not be confused with a comprehensive renovation as described in FQ 23002-23415.
If an activity meets these narrow criteria (i.e., if a firm demolishes and rebuilds a structure to the extent that it is effectively new construction), then the activity is not a renovation for purposes of the RRP Rule and therefore not subject to any RRP requirements.
If, after 1978, target housing has been demolished and rebuilt to the extent that it is effectively new construction, subsequent renovations on the property would also not be subject to the RRP Rule. In other words, if target housing has been demolished and rebuilt to the extent that it is effectively new construction, it is no longer target housing. Conversely, if only a portion of the target housing has undergone a post-1978 modification (e.g., an overhaul of a kitchen or bathroom), then a subsequent renovation would still be covered under the RRP Rule.
Frequent Questions
- Asbestos
- Top 20 Asbestos Questions
- Asbestos in the Home
- Asbestos in Schools
- General
- Applicability of AHERA
- School Personnel Training
- Asbestos Sampling and Testing
- Inspections and Reinspections
- Annual Notification Requirements
- Local Education Agency Designated Persons
- Recordkeeping and Asbestos Management Plans
- Small-Scale and Short-Duration Projects
- Determining Friability
- Response Actions
- Operations and Maintenance
- Labeling of Asbestos-Containing Materials
- Asbestos Model Accreditation Plan (MAP)
- Asbestos in Vermiculite
- Finding Asbestos
- Asbestos in Brakes
- Reporting a Violation
- Biotechnology
- Chemical Data Reporting (CDR)
- General
- Chemical Substances Subject to the CDR Rule
- Are You a Mfr. or Importer Required to Report?
- Information You Must Report
- Completing Form U
- Confidentiality Claims & Certification Statements
- Other Chemical Data Reporting Issues
- Chemical Information Collection and Data
- Federal Electronics Challenge
- Formaldehyde
- Import-Export
- Mercury
- Nanotechnology
- New Chemicals Program
- PBTs - persistent bioaccumulative toxic
- PCBs - polychlorinated biphenyls
- PFOA - perfluorooctanoic acid
- Section 8e
- Topic #: 23002-18426
- Date Created: 4/14/2010
- Last Modified Since: 5/20/2011
- Viewed: 5597
